Công ty TNHH Hóa dầu Long Sơn

Location: Xã Long Sơn, TP. Vũng Tàu, Tỉnh Bà Rịa Vũng Tàu

Company size: 1.000-4.999Field of operations: ForeignWebsite: https://longsonpetro.com/

3.568 followers

Jobs active (11)

Job Title Location Salary Updated
Mechanical Inspection Engineer (New) Ba Ria-VT Competitive 27-09-2024
Maintenance System Engineer Ba Ria-VT Competitive 27-09-2024
Safety Engineer / Kỹ sư An toàn Ba Ria-VT Competitive 23-09-2024
Senior Accountant - Managerial Ba Ria-VT Competitive 21-09-2024
Junior Accountant - Costing Ba Ria-VT Competitive 21-09-2024
Junior Accountant - Financial Ba Ria-VT Competitive 21-09-2024
Spare part - Bảo trì phụ tùng, vật tư cơ khí Ba Ria-VT Competitive 20-09-2024
Mechanical expert Ba Ria-VT Competitive 13-09-2024
Assistant Administrative Officer (Outsourcing) Ba Ria-VT Competitive 05-09-2024
Bảo trì Điện / Electrical Technician Ba Ria-VT Competitive 05-09-2024

About us

Long Son Petrochemicals Company Limited (LSP), a company incorporated in the Socialist Republic of Vietnam, has been established to develop, construct and operate Vietnam’s first integrated petrochemicals complex located in Ba Ria-Vung Tau province. The Project will comprise a world-scale grassroots mixed-feed cracker, downstream polyolefins plants (HDPE, PP and LLDPE), central utilities unit, port, jetty and storage facilities and other associated facilities.

As the first integrated petrochemicals project in Vietnam, the strategic importance of LSP lies in its import substitution nature to meet Vietnam’s sustained and fast growing domestic demand for polymer resins and to enhance the competitiveness of its plastic industry, an important export earner for Vietnam.

Site Location:

The Project enjoys a favourable location in the South of Vietnam, in close proximity to the end-user market in Vietnam as well as the export markets of Asia Pacific. The Project will be located on Long Son Island, next to the Long Son Industrial Zone (Long Son IZ) in the northwest of Vung Tau city, Ba Ria-Vung Tau province, South Vietnam.

The site location of the Project is approximately 90 km from Ho Chi Minh City and 25 km from Vung Tau city, in a region where approximately 80% of Vietnam’s plastics industry is located. Land area of the Project is approximately 464 hectares, including area for future expansion, and is close to National Road No.51, connecting Ho Chi Minh City, providing convenient access and facilitating efficient product transportation.

The proposed location and ground conditions are suitable for setting up of a petrochemicals complex, including adequate access to sea shore and international shipping routes for exports and imports of goods and end-user markets.

Message

Please sign in to perform this function

Sign in by

Hỗ Trợ Ứng Viên: (84.28) 3822-6060 hoặc (84.24) 7305-6060
In Partnership with