- © Copyright of Vietnamnet Global.
- Tel: 024 3772 7988 Fax: (024) 37722734
- Email: evnn@vietnamnet.vn
Update news cat linh-ha dong
A group of 23 Chinese experts have started work on the long-delayed Cat Linh – Ha Dong urban railway line in Hanoi after successfully undergoing a 14-day quarantine period
Vietnam Register have provided a temporary safety certificate for 13 trains for the Cat Linh-Ha Dong metro project.
VietNamNet Bridge - On Friday, Minister of Transport Dinh La Thang suspended the Head of the Vietnam Railway Administration for his statements related to the Cat Linh-Ha Dong urban railway project.
VietNamNet Bridge – A proposal made by the Chinese contractor in the Cat Linh-Ha Dong railway project has been denounced by experts as “illegal” and “unacceptable”.