- © Copyright of Vietnamnet Global.
- Tel: 024 3772 7988 Fax: (024) 37722734
- Email: evnn@vietnamnet.vn
Update news ho chi minh highway
Vietnam expects to complete the remaining 13km of the 2,656.5km Ho Chi Minh Highway in early 2027, paving the way for the formal conclusion of its two-lane construction phase and future upgrades to expressway standards.
Binh Thanh Police nab murder suspect, Hot spell raises risk of strokes, Hanoi curbs crane operations, Ho Chi Minh Highway, Highway 1 to be repaired, 2015 blood donation campaign to go through 25 localities
VietNamNet Bridge - 57 stops-overs will be built along the trans-Vietnam Ho Chi Minh Highway, at a total cost of VND5.8 billion, equivalent to $276 million, from now to 2030, with a total area of 326 hectares.