Sections of Sai Gon Bridge, one of the five bridges of metro route No. 1 Ben Thanh-Suoi Tien in Ho Chi Minh City, were joined on September 30.



The two-lane bridge's main span measures 267.5m long and 11.1m wide. It forms part of the metro route No. 1, Ben Thanh-Suoi Tien, together with Van Thanh, Dien Bien Phu, Rach Chiec and the flyover on Hanoi Expressway, which is due to become operational in 2020






A section of the railway bridge





Workers at the construction site
























VNA