- © Copyright of Vietnamnet Global.
- Tel: 024 3772 7988 Fax: (024) 37722734
- Email: evnn@vietnamnet.vn
Update news Pham Van Dong Street
VietNamNet Bridge – More than 1,000 old trees on Pham Van Dong Street will be chopped down by the end of this year to broaden the street and build a bridge on Belt Road No. 3.
VietNamNet Bridge – Last weekend, Hanoians experienced the worse heat wave recorded in four decades, with the highest temperature reaching 41.5 degrees Celsius. The "real feel" was much higher.